VAK Russia 2.1.14 UDC 658.513.4 CSCSTI 67.01 Russian Library and Bibliographic Classification 386 VAK Russia 2.1.1 VAK Russia 2.1.2 VAK Russia 2.1.3 VAK Russia 2.1.5 VAK Russia 2.1.6 VAK Russia 2.1.7 VAK Russia 2.1.8 VAK Russia 2.1.9 VAK Russia 2.1.10 VAK Russia 2.1.11 VAK Russia 2.1.12 VAK Russia 2.1.13 VAK Russia 2.1.15 Russian Library and Bibliographic Classification 308

TIME RESERVATION DURING CONSTRUCTION OF LARGE-SCALE PROJECTS Time reservation during construction of large-scale projects

Published in Construction and Architecture · Volume 12, Issue 2, 2024 · Pages 3–3 · Rubric: 2.1.7. TECHNOLOGY AND ORGANIZATION OF CONSTRUCTION (TECHNICAL SCIENCES)
DOI: https://doi.org/10.29039/2308-0191-2024-12-2-3-3 · EDN: MHATEP
Received: 25.04.2024 Accepted: 04.05.2024 Published: 20.06.2024 Language of publication: ru-RU
The article considers the area of life cycle time management of construction of large-scale and technically complex unique objects. In particular, the authors of the study raise the issue of time reservation to compensate for the risks of untimely fulfillment of contractual works and failure of commissioning of construction projects. The review of normative, legislative and scientific base on the subject of the research is carried out. The methodology of time reserve distribution between the project participants according to the ascending or descending scheme depending on the initial conditions is given. It is emphasized the importance of including the results of the calculation of time reserve allocation in the construction schedule. The formula for calculating the costs that depend on the value of a certain reserve is presented. It can be represented as the sum of the probable value of penalties payable in case of delay in the works assigned to the contractor, and additional costs arising from the creation of increased capacity of the construction and assembly organization.
construction of large-scale projects, time reservation, construction timing, schedule and network planning, construction risk management, construction organization project, critical path
Text References

1. Nikitenko, A. V. Development of the theory and methodology of investment projects risk management / A. V. Nikitenko // Economy and society: modern models of development. – 2017. – № 16. – S. 75-88. – EDN ZSWOPP.

2. Fetisov, A. Yu. Methods and techniques of tax risk management at the enterprise of housing construction / A. Yu. Fetisov, T. Yu. Serebryakova // Bulletin of the Russian University of Cooperation. – 2018. – № 1(31). – S. 80-83. – EDN YVAUIR.

3. Chinenova, D. A. Risks and methods of risk management in oil and gas pipeline construction / D. A. Chinenova // E-Scio. – 2023. – № 4(79). – S. 452-459. – EDN NZDPNC.

4. Pavlov, A. S. Public procurement in construction - suggestions for improvement / A. S. Pavlov, R. V. Ostrovsky // Vestnik MGSU. – 2022. – T. 17, № 4. – S. 501-515. – DOIhttps://doi.org/10.22227/1997-0935.2022.4.501-515. – EDN WZAVQH.

5. Klykov, M. S. Optimization of temporary reservation of the need in stored resources taking into account the reliability of the bridge construction schedule / M. S. Klykov, A. V. Zemskov // Far East: problems of development of the architectural and construction complex. – 2014. – № 1. – S. 249-253. – EDN TBREMB.

6. Nikonorov, S. V. Increase of organizational and technological reliability of construction in modern conditions / S. V. Nikonorov, A. A. Melnik // Bulletin of South Ural State University. Series: Construction and Architecture. – 2019. – T. 19, № 3. – S. 19-23. – DOIhttps://doi.org/10.14529/build190303. – EDN JQRUNE.

7. Bondarenko, Yu. V. Mathematical methods to support project network analysis and planning risk assessment under fuzzy information about work durations / Yu. V. Bondarenko, E. V. Vasilchikova // Vestnik of Voronezh State University. Series: System Analysis and Information Technologies. – 2023. – № 2. – S. 100-111. – DOIhttps://doi.org/10.17308/sait/1995-5499/2023/2/100-111. – EDN ULOXXK.

8. Kalugin, Yu. B. Universal method for calculation of reliable completion times / Yu. B. Kalugin // Magazine of Civil Engineering. – 2016. – No. 7(67). – P. 70-80. – DOIhttps://doi.org/10.5862/MCE.67.7. – EDN YFWGLB.

9. Harchuk, E. G. Toolkit for determining the work sequence / E. G. Kharchuk, E. S. Ivanets // International Scientific Journal Internauka. – 2017. – T. 2, № 15(37). – S. 59-62. – EDN ZWLLZZ.

10. Budnikova, I. K. Modeling of controlled processes using network planning methods / I. K. Budnikova, E. V. Priymak // Vestnik of Technological University. – 2018. – T. 21, № 1. – S. 115-118. – EDN YRHDVN.

11. Voronkov, I. E. Evaluation of factors influencing changes in the duration of NPP construction / I. E. Voronkov, R. V. Ostrovskiy, I. G. Agapov // Construction Production. – 2023. – № 4. – S. 105-110. – DOIhttps://doi.org/10.54950/26585340_2023_4_105. – EDN ZDLBHO.

12. Bolotin, S. A. Entropy of the actual construction schedule / S. A. Bolotin, A. H. Dadar, R. A. Magamadov // Bulletin of Civil Engineers. – 2016. – № 3(56). – S. 123-129. – EDN WHFDZR.

13. Pavlov, A. S. Analysis of work execution time during the construction of nuclear power plants / A. S. Pavlov, R. V. Ostrovsky // Industrial and Civil Construction. – 2023. – № 1. – S. 75-80. – DOIhttps://doi.org/10.33622/0869-7019.2023.01.75-80. – EDN TZYWUH.